5 Steps For Installing a Bath Tub

Broken, old or leaky bath tubs can be a major risk to the floor of your bathroom. Installing a tub to replace your old damaged one might be exactly what you need to give fresh and new appearance to your bathroom. If you’re budget-conscious and are looking to do the project yourself prior to calling a plumber, these tips can come in handy.

The process of installing requires a lot of planning ahead before you begin the installation task the installation itself. Here are some of the things to consider before, during , and after the installation. Assume that you’ve removed the old tub and purchased the new one you intend to put in. Check that the new item is the right size in terms of size, length, and width dimensionsScarborough plumbers.

Step 1: Get the Right Tools

The most basic tools you’ll require for installing include nails, screws, tube cutters, hammers hack saw and pipes. Galvanized screws and nails are the best to avoid rust.

Step 2: Start to Assembly

The drain pipe and the P-trap must be set up to ensure that the P-trap is at a level with the floor, and is below the drain pipe that is in the middle. The drain pipe must be put together and all overflow pipes should be installed according to the specifications of the manufacturer. Dry fit them into the P-trap. Take measurements of the length that is needed to connect to the drain pipe (drain) into the P-trap. Cut the pipe to match the measurements and connect to the bathtub.

Step 3: Set the Ledger Board

The ledger boards are the base for the edges which connect with the walls of your enclosure, or the space you’ll use to place your bathtub. Place the tub in the space (the enclosure) and mark it with a few marks one mark on the top of the bathtub’s nailing flanges on the wall studs, and the second mark should read 1″ below the first mark. Install the ledger boards over the marks using screws for drywall or galvanized screws. The tub should be level and the tub needs to be placed upon the boards. Drain pipe you’ve attached must smoothly fit into the P-trap.

Step 4: Fix the Material

The tub needs to be secured in the desired place by nailing nails galvanized onto the flanges. Plugs should be inserted into the overflow opening and make sure you insert the cover plate for overflow.

Step 5: Time to Test

Tests are conducted to make sure that everything is working properly in your system. Just turn on the taps and let the water flow assist you in identifying any problems with the drainage or plumbing system.

If you have removed any tiles, you can either redo them or substitute them with identical ones in the manner you prefer. It is recommended to install the showerhead, bathtub spouts and faucet handles must be put in place.